We take pride in everything we do, and our projects are a prime example of the precision we always strive to achieve. Take, for example, our recent wash bay installation in Nottinghamshire, where we relocated some of the client's original wash bay equipment from their previous installation, alongside the preparation, excavation, and concrete pour,
Completed last week, the project entailed the installation of a GRP silt trap, a pump and interceptor complete with all ducting & pipework, levelling off the existing surface, and the construction of 20m X 10m concrete bay for the wash area, and all complete with two user posts and hose reels for jet washing.
Photographed from start to finish, each stage has been meticulously undertaken and we're thrilled with the results.