Posts

Showing posts with the label user posts

Commissioning of final fix at project Caenby Corner

Image
Our installation expert, Ian Bridges, is commissioning the final fix and fit at Caenby Corner this week, which  consists of a reclaim system, a  zone injection system, a  10cum3 wash bay 3 stage interceptor, a  ST2000 silt trap, a d iverter chamber with air, and a  10cum3 storage tank. Along with the installation of t wo oil-fired static hot water jet washers, two  user posts to install on wash pad s, a  fitted-out plant room, two   remotes for the user posts, and two hose guns and a lance.  This final phase includes commissioning the equipment, terminating pipework and connections, sealing joints, capping off any ducting, and making good. The task will also involve the connection of hose reels, fiitting hoses, guns and lances, and the labelling up and testing of switch boxes. Alongside running and testing HP jet washers, including pressure and flow, unloader pressure, auto stop and safety switches. And la...

Successful completion of Project Langar in photo form

Image
We take pride in everything we do, and our projects are a prime example of the precision we always strive to achieve. Take, for example, our recent wash bay installation in Nottinghamshire, where we relocated some of the client's original wash bay equipment from their previous installation, alongside the preparation, excavation, and concrete pour,  Completed last week, the project entailed the i nstallation of a GRP silt trap, a pump and interceptor complete with all ducting & pipework, levelling off the existing surface, and the construction of 20m X 10m concrete bay for the wash area, and all complete with two user posts and hose reels for jet washing. Photographed from start to finish, each stage has been meticulously undertaken  and we're thrilled with the results. To dig deeper into our various wash bay solutions, contact us on 01246 471147, or at  info@morclean.com , or simply visit our  website  today .  Still undecided? Take a look...

Fit for purpose at Project Langar

Image
Everything is coming along nicely, despite a few delays in getting hold of materials, at Project Langar. With the fitting of the jet wash, hose reels and pipework taking place today, alongside running and testing, I will be posting an overall update next week, when everything has been signed off and completed. in the meantime, if you'd like to know more about our vehicle and plant wash systems, visit our site at  www.morclean.com . or give us a call on 01246 471147, where one of our friendly and knowledgeable team will be able to answer any questions you may have. Posted by Michelle Reece ( Marketing Manager)  

Marketing Mucks in at Project Langar

Image
All was quiet on the social front yesterday, as I embarked on a s ite visit to take photos  of project delivery progress at our Langar project in Nottingham. It's the first time I've seen the excavation stage of a wash bay installation up close and personal, and it was a fascinatingly valuable experience. Health and Safety First Upon approaching Morclean's cordoned-off area, which is under full ownership and control of Morclean or it's subcontractors during works, a vivid blue Morclean H&S station sat at the entrance to the site, The H&S station comes  complete with a visitor and contractor signing-in record book, HSE law poster, first aid box, fire extinguisher, and an accident book, together with a fully stocked first aid kit, As an accredited Safe Contractor, Morclean is fully dedicated to ensuring that health & safety procedures are regularly upgraded and updated in line with legislation, and our H&S Station ticks all of the regulation boxes....