Work Begins on Project Langar for New Wash Bay Facility

Image
Another new wash bay project starts today, this time in Langar, Nottinghamshire, for a well-known company  that manufactures agricultural, construction, and forestry machinery, to name a few.   The  Morclean  team are currently marking out and saw cutting on-site, to follow with excavating for a silt trap, pump chamber, interceptor, and plant room. The wash bay is to be kerbed all round and e nveloped to a 2000mm x 500mm x 1000mm silt trap. We will also be supplying and installing a 650mm x 1000mm PC2000 pump chamber, and the s ilt trap is to pumped to an above-ground interceptor -  all including  the moving and refitting of the GRP plant room and interceptor from their previous depot. Alongside this we will be installing 110mm ducts for power and water,  110mm ducts for 2 hose reels, a trench to manhole for drain outlet, and we are to then backfill and make good, and remove all waste from site. For more information on our wash bay project...

It's Going to be a Busy, Yet Exciting Year for the Morclean Team!

Image
With over twenty projects at the quoting, planning, or prepping stage, we're all geared up for our busiest year ever.  From Glasgow to Germany, and Stevenage to Spain, we've had a record number of  inquiries for  wash bay, wash pad, jet wash, and interceptor installs  throughout the UK, Scotland, and Europe. Our first project, in East Lothian at the very beginning of March, is a turnkey project that will involve  excavation and civil works to install a new silt trap and pump  chamber, a plant room, and an interceptor, alongside two huge 20CuM3 tanks and a separator. Phew, it's a big job but the type of project we thrive on.   Once we've completed this Scotland based project, we're off to Nottingham to install yet another silt trap, pump chamber, plant room, and interceptor, alongside a brand new jet wash... but more about that later. For now, we'll concentrate on East Lothian, bringing you regular updates throughout each phase.  To see ou...

Morclean Wash Bay Project in Worcester Complete and Set In Concete

Image
Our Worcester Project was completed and signed off by the client on time and on budget, at the beginning of last week, and we now have the photos in for this circa 150M2 wash bay.  The bay will be used for plant and generator washing, and the works included the installation of a silt trap and interceptor. To discover more about our wash bay facilities and associated works, please visit our  website  today, or if you would like to discuss your requirements, please feel free to ring us on 01246 471147 or email us at info@morclean.com where one of our experienced team members will provide you with the advice that you are seeking.

Chelmsford Project Almost Ready for Handover

Image
We are currently working with a 3rd party contractor to have our most recent Project - which is for a car hire centre located in Chelmsford - handed over soon. We have undertaken the survey, prior to backfill, while working with other contractors to complete the works. Morclean has supplied the interceptors, holding tanks, silt traps, and associated equipment (civils by others) for the installation of a wash bay for a major player in the car rental market . Completion is planned for early February, so we're on track and on target. For more information on our vehicle wash systems, visit here . Alternatively, if you wish to speak to one of our experienced team members, please call us on 01246 471147, or email info@morclean.com

East Lothian Wash Bay Project Scheduled for a Spring Start

Image
The Morclean team has been involved in the planning and design of a new wash bay plant on a site in East Lothian for over a year, but after a somewhat tumultuous period of time, we're now ready to make a start in Spring.  The turnkey project will involve excavation and civil works to install two large 20CuM3 interceptors, and an additional separator, with a complete wash bay to follow. The wash bay is to be squared off, which should result in; less unusable space  utilisation of levels that lend themselves to its orientation less surface water running onto the wash pad better/easier turning circles for the vehicles  Morclean is to saw cut and peck out the area, ensuring that it is fully  isolated, whilst following stringent Health & Safety (H&S) procedures throughout. To see our most recent projects in picture click  here , or to view our past projects click  here . Alternatively,  ring us on 01246 471147, or email us at  info...

Looking to the Future with Project Wiltshire

Image
The Installation of a new 200M2 wash bay - with dual user wash points, interceptor, and silt trap - is underway. With deliveries and marking out already in progress, this exciting project is inching closer to a Spring completion. The wash bay is intended for cleaning down fire vehicles for a military aircraft testing unit, and the works will include  excavation of the area and civils to install the below-ground tanks, alongside the installation of a twin hot water high-pressure jet wash with dual user posts and hose reels.  The project will be Turnkey with end-to-end project management and a complete system ready to handover to the client. Click on the following links if you're interested in viewing our  past  and most  current  project portfolios. Alternatively, give us a ring on 01246 471147 or email info@morclean.com to discuss your needs, or visit our website at www.morclean.com to view our full range of products.

Phase 2 of our Worcester Wash Bay Project is Well Underway...

Image
With everything set out and ready for the first delivery of concrete for this large wash bay construction yesterday, we were already mid-way through this exciting project. Today, with the first pour of concrete, we're bang on schedule for completion at the end of next week here in Worcester. As always, the Morclean team is working hard to ensure we're on target, despite the ever-changing weather conditions consisting of wind, rain, snow, and frosty mornings.  The circa 150M2 wash bay will be used for plant and generator washing, and the installation includes a silt trap and interceptor, and our team is working safely while being on time and on budget in the design. delivery. installation, and handover of this project. To discover more about our wash bay facilities and associated works, please visit our website today, or if you would like to discuss your requirements, please feel free to ring us on 01246 471147 or email us at info@morclean.com where one of our experienc...