Commissioning of final fix at project Caenby Corner
Our installation expert, Ian Bridges, is commissioning the final fix and fit at Caenby Corner this week, which consists of a reclaim system, a zone injection system, a 10cum3 wash bay 3 stage interceptor, a ST2000 silt trap, a d iverter chamber with air, and a 10cum3 storage tank. Along with the installation of t wo oil-fired static hot water jet washers, two user posts to install on wash pad s, a fitted-out plant room, two remotes for the user posts, and two hose guns and a lance. This final phase includes commissioning the equipment, terminating pipework and connections, sealing joints, capping off any ducting, and making good. The task will also involve the connection of hose reels, fiitting hoses, guns and lances, and the labelling up and testing of switch boxes. Alongside running and testing HP jet washers, including pressure and flow, unloader pressure, auto stop and safety switches. And la...