Posts

Showing posts with the label fixed jet washes

Planning ahead at Denbigh, Wales

Image
We have just embarked upon a new wash bay project for a company that cleans down refuse trucks in Denbigh, Wales, which will be executed in separate three phases over a one-and-a-half-year timeline. This project will comprise of the installatio n of silt traps, an interceptor, wash water collection tanks, a water reclaim system (where all the all water is fully recycled), a gantry with steps and a walkway to reach top of vehicles, screens, two fixed jet washes, hose reels and pipe work.  The way that each phase of these works is being broken down throughout this period of time is as follows: Phase 1 - Supply 01 November 2021 Silt trap Interceptor Wash water tanks Phase 2 - Reclaim  Scheduled for early/mid-2022 Installation Phase 3 - Wash Bay Installation Scheduled for Spring 2023 Gantry Screens 2 x fixed jet wash Hose reels Pipework Some projects need time. We have the knowhow and patience. We'll be updating you on the first phase of this project soon, but in the meantime, che...