Work Begins on Project Langar for New Wash Bay Facility
Another new wash bay project starts today, this time in Langar, Nottinghamshire, for a well-known company that manufactures agricultural, construction, and forestry machinery, to name a few.
The Morclean team are currently marking out and saw cutting on-site, to follow with excavating for a silt trap, pump chamber, interceptor, and plant room.
The wash bay is to be kerbed all round and enveloped to a 2000mm x 500mm x 1000mm silt trap.
We will also be supplying and installing a 650mm x 1000mm PC2000 pump chamber, and the silt trap is to pumped to an above-ground interceptor - all including the moving and refitting of the GRP plant room and interceptor from their previous depot.
Alongside this we will be installing 110mm ducts for power and water, 110mm ducts for 2 hose reels, a trench to manhole for drain outlet, and we are to then backfill and make good, and remove all waste from site.
Comments
Post a Comment