Project Gainsborough well into phase 2

We love getting our teeth stuck into a new project here at Morclean, and our current program of works is just as stimulating and as satisfying as ever.

Working alongside both the Main Contractor and Subcontractors at a site in Gainsborough near Lincoln, we are installing a refuse lorry truck wash over a 12 duration, phase by phase: 

Phase 1

Supply interceptors, silt traps, wastewater tanks, etc.

Phase 2

Fix all pipework and connections.

Phase 3

Supply and install 2 x hot water cabinet/static jet wash machines, which feature:

  • Locked cabinets
  • Remote control
  • Hose reels – no trailing hoses
  • Frost protection
  • Reduced opportunity for theft
  • Connection to power and water – no plugging in/putting away or trailing cables

With Phase 1 completed and Phase 2 underway, the final fit-out is scheduled for August through to early September.

This is just one of several projects by Morclean in progress now, so stay tuned for updates, progress, and more.

Ring us today on 01246 471147 to discuss your requirements, or email us at info@morclean.com for a free no-obligation quote. Alternatively, visit our website at www.morclean.com to view our whole range of industrial cleaning equipment, systems, and project solutions.


Comments